2026 started with wrapping up an install of a new network and moved on quickly to some fun projects.
January was a quiet month related to travel. Spent the month working on deliverables and marketing efforts mostly. Put on a webinar on building a secure wireless network for one of our partners. Did some predictive designs for a major manufacturer as well.
February found us back in a warehouse we had designed and installed previously. Seems their neighbors changed their network around a bit and were creating a mess of the wireless spectrum. Sorted out the issues and helped them get configured better to deal with the neighbor. Wireless is never easy! Later in the month, conducted a series of validation surveys for designs that we did last year. Used the results to fine tune the networks. Middle of the month, we began our annual site survey project for a few cyber charter schools. These surveys are a combination of wireless and cellular coverage checks along with ensuring the facility meets their needs for student testing. At the same time, we started a big push with a state government to survey and design wireless for their many sites (rumor is 200 to 1000 sites over the next few years).
March had us continuing the site surveys for the cyber charter schools and the state sites. Threw in some service calls and remote network changes for managed clients. Now that the snow had melted, we also slipped in an outdoor survey for a major estate property, then took a trip to Iowa to design WiFi in a large warehouse / manufacturing facility.
April kicked off another round of state government site surveys. This time in juvenile detention centers mostly. These sites are very complex, have some tough construction to work with, and present a safety challenge when working. We also ran to New York to install an outdoor wireless solution at a major estate now that their renovations and additions were ready for our work.
May found us doing wireless designs for a chain of acute care rehab facilities. They have twenty locations and so far we have completed about 8 of them. Kicked off planning for a major network rebuild and modernization for a large auto dealership in New York. Also kicked off a design planning effort for a municipal wireless network for a client in Virginia. Continued our work with the juvenile detention centers. Ended the month with a wireless site survey to fix issues at a large estate on a tropical island.
June started with a quick trip to New York to do a site walk through for the auto dealership. Tightened up the plan as a result and started the hardware ordering process. Actual install is in September, but there is a lot of planning and preparation to do. All hardware is here now and we are building the network out in our office so it can be easily swapped in a single day. Planned out their phone system migration and got that underway. Integrating their phones and CRM solution, cleaning up their data closets, replacing all switches and routers (most are currently over ten years old and not supported now). Multi-site with multiple ISPs per site. Some more work with the juvenile detention centers and finalizing their designs and reports. Knocked out service calls in Baltimore and Nashville. Also conducted site surveys at three of the acute care rehab facilities. Their designs will be done next month.
July started out working on previously surveyed site designs and some site surveys to quote some projects. Had another install this month for a partner. Mostly a lot of catch up on designs and planning the big car dealership effort.
August found us working on designs from previous site surveys. Later in the month, we went to Lake Placid NY to do some installs at the US Olympic Center’s Jumping and Bobsled facilities.
September started with a stop at the car dealership in NY as we came back from Lake Placid. Sorted out some more details, filed a change order due to scope change. Conducted a site survey in central Virginia to prepare for an upcoming project where we will deploy a public WiFi network in a housing project, then manage it. They have additional sites for us to tackle when we are finished with the build-out of this one. Looks like five total right now. Later in the month we started the car dealership migration project but had some challenges along the way with the outgoing vendor (no current documentation, devices labeled wrong, changing configs after giving us the current configs). First time in our history we had to execute a roll-back on a project. Our roll-back plan worked well – everything came back online as expected. Had a serious conversation with the outgoing MSP and got what we needed to move things forward again. Started another long-term project with a botanical garden center in Delaware, doing WiFi support and design for unique situations and extensive needs to blend things into the historic building and grounds.
October found us visiting our favorite zoo, NoVA Wild in Vienna VA. One of our managed networks. Did some repairs from storm damage and turned up a new camera for them. Did some troubleshooting in a doctor’s office that is dealing with significant WiFi interference. Conducted a WiFi validation post-install and a full design survey for two acute care rehab facilities. Started a year-long effort with another regular client supporting their office renovations (running new Ethernet, fiber, and moving a rack). Then on to a car dealership in New York to work on a major network rebuild project. Phase 2 of 3 in the conversion to a new network design. That was a week of running fiber, racking up new gear, wiring it into the rack cleanly, cleaning up past wiring issues, and staging everything for the final push in November. The month is not quite over… more to come.