Mid-month we headed west. A couple of weeks of working in the desert to finish up the projects we started in May. Supply chain and broken lift equipment held us up a little previously. These projects included some alignments, installing power cabinets and DC power systems, dressing cables, rewiring an entire tower, installing new network switches. Lots of time spent up in the air on a lift.
Prepared radio equipment for deployment at Burning Man.