Posting this one a few days early as we are deep into an install…
Early in the month we wrapped up the non-profit and the credit union with our post-install validation surveys. Both sites had perfect coverage as designed predictively. As a result of the work we did for the credit union, we were asked to start working on some of their other sites which will start in earnest in April.
Most of the month was spent preparing for the brewery install in Minneapolis and the PtP link in Rockford. We are currently in Minneapolis, starting the brewery install. This will be a full Ubiquiti stack consisting of the UDM-SE as the core router and applications server, several higher end UI switches, several UPS units (three racks, one in each rack), 14 access points, 26 cameras, and 11 Access hubs for door controls. Busy week ahead wrapping up this install this week.
End of the week, headed into April will see us headed to Rockford IL to install the PtP link we designed.