Started the month off with fixing a residential install in a beach house. It was a poor design by a poor installer. Most APs were barely installed on the ceiling. Outdoor APs were upside down or sideways allowing water in. Corrected these issues and made sure everything was good to go for them.
Started working on another design for a WISP in the south.
Finished up the month working on a tower in the mid-west with a great tower crew. Got some backhauls and sectors up. Basic service until we had more crew available to help with the rest.